EPC Linked Document Set Excel: Equipment List, Line List, Instrument Index, MTO

₹2,499.00

In Stock

On an EPC job the equipment list, line list and instrument index must agree with the material take-off. This linked set keeps them in one workbook, so a change in one list flows to the quantities.

What it helps you do

  • Keep equipment, line and instrument lists together
  • Link each list to the MTO summary
  • Cut re-typing between documents
  • Spot missing or mismatched items early

Data is yours, and the formulas are open. It suits EPC engineers and document controllers. See also the EPC document management workbook, the EPC project costing control workbook and the piping material specification workbook. Delivered by email and WhatsApp after purchase.

Select your currency
INR Indian rupee