A data centre needs power in and heat out, and both must be sized together. This calculator relates the IT load to the cooling needed, the electrical supply and the chilled water flow.
Inputs are your own, and the formulas are open. Final design should be checked by the responsible MEP engineer. See also the HVAC load, duct and chilled water calculator, the electrical load list and the lighting load calculator. Delivered by email and WhatsApp after purchase.




2021 All Rights Reserved By Growmechanical