Field signals usually meet at a junction box before going to the control room. This schedule lists each box with its location, the cables that enter it and the terminals still free.
You fill in the data, and the counts are formulas you can follow. It suits instrument and electrical designers. See also the instrument cable schedule, the DCS/PLC I/O point count estimator and the hook-up drawing checklist. Delivered by email and WhatsApp after purchase.




2021 All Rights Reserved By Growmechanical